Papradňanská dolina

Project: Papradňanská dolina- sewerage

Location: Považská Bystrica, Jasenica, Stupné, Brvnište, Popradno

Construction value: 7,429 mio. EUR

Client: Považská vodárenská spoločnosť a.s.

Time period of provided services: 06/2009- 10/2013

Description: Construction of new drains in total length of 32.4 km. Building entrance stations – 4 pcs. Building a house connections – 1882 pcs. The main objective of the site Papradňanská dolina sewerage and draining ewage treatment plant to intensified the city of Považská Bystrica.

The main goal is to build trunk sewer, sewer systems in villages Jasenica, Stupné, Brvnište and Papradno, pumping stations sewage on sewerage system and sewage connections for future wastewater producers.
Reduce the damage on the environment – improving the quality of groundwater and surface water in the river Papradňanka. Comply with the Directive on Urban Waste Water Directive 91/271/EEC.

Provided services: Site supervision