Diaľnice a rýchlostné cesty D4R7 Obchvat Bratislavy The PPP project includes Design, Construction and Financing, including the operation and maintenance of the newly built highway and expressway. The total length of the motorway and expressway is 59 km 14 connected and more than 1000 objects including the bridge over the Danube, which will be the longest bridge in Slovakia. The length of the Concession is 30 years. R1 Motorway The first Slovak PPP project, R1 Motorway, consist of 4 new motorway sections Nitra- Selenec, Selenec- Beladice, Beladice- Tekovské Nemce and Northem Baypass of Slovak city Banská Bystrica in total lenght app. 52km. Construction of these missing parts of R1 Motorway shall connect the Slovak capital city Bratislava with the city Banská Bystrica located in the middle part of Slovakia. The scope of the work represents the Property- law services and Engineering activity for the Contractor- Granvia Construction s.r.o. Railways Modernization of railway. line Žilina – Košice The property settlement on the line section Važec – Eastern Railway Station, which is a 7.039 km of the original route, shortening the upgrade to 6.92 km. For stage it was modernized railway station and bus station Važec East. The new part of the track passes through two tunnels – Dubrava (1,330 meters) and Zámčisko (155 meters). The entire section is designed for line speed min. 160 km / h (with parameters to 200 km / h). Modernisation of railway line Nové Mesto nad Váhom – Puchov The purpose of the construction is to modernize the technical infrastructure of tracks on the section concerned, which is part of the TEN-T and the European rail corridor. In order to achieve the parameters under European Union legislation. The main task is to enable better accessibility to trans-European transport networks and the transport network of neighboring states. Railway Modernization Trenčianska Teplá- Ilava- Beluša Modernization of the two- track railway up to 160km/hod., sections 4 and 5 Trenčianska Teplá- Ilava- Beluša with total lenght more than 20km is a part of the railway modernization between the cities Nové Mesto nad Váhom and Púchov in total lenght 58,6km. Within the 4th. and 5th. section has to be done reconstruction of the railway stations Trenčianska Teplá, Dubnica nad Váhom, Ilava and Ladce. The scope of the work represents the site supervision of all utility lines fot the Site supervision company SD- BELUŠA s.r.o. a subsidiary company of the company DOPRAVOPROJEKT a.s. Pozemné stavby Management and Maintenance Centre in Banska Bystrica The first Slovak PPP project is divided into four sections, one of which represents R1 – northern bypass of Banská Bystrica. Construction of the new expressway sparked the need for the construction of the Centre, through which the concessionaire GRANVIA and its subsidiary Granvia Operation can easily provide road maintenance during the winter period. Brown Industrial Zone Levoča- South Brown Construction Industrial Area Levoča – South (HPZL-South) is located in the southern part of the administrative area of road communications along Levoča II. Class no. 533 in the direction of Spišská Nová Ves. The investment plan fully respects Levoča Land Use Plan, the requirements of the client as construction and industrial buildings for future investors. Water supply, sewerage and wastewater treatment plant of the Region of Dolné Kysuce Reconstruction of WWTP Kysucké Nové Mesto.Construction of drains in Kysucké Nové Mesto and villages Nesluša, Povina,Radoľa in total length of 31,232 m.Construction of 11 filling stations implementation of the 1399 piece house connections.The main objective of the project is the collection and treatment of wastewater in respect to ensuring compliance with the requirements of EU Directive 91/271/EEC and Government Regulation 296/2005.The specific goal of the project is that the project should ensure the elimination of emission of polluted wastewater into local streams in areas where sanitation was built and the abolition of leaking septic. Hospital Rázsochy The company FCP-SK Ltd. is active in the hospital sector. Experts working in our company dealt in the years 2005 – 2007 with the possibility of completion of the unfinished hospital Rázsochy. Draw up reports, expertise and processed conceptual design completion hospital.